The Urban Developer
AdvertiseEventsWebinars
Urbanity
Awards
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
Untitled design (8)
FULL PROGRAM RELEASED FOR URBANITY-25 CONNECTING PROPERTY LEADERS ACROSS THE ASIA PACIFIC
FULL PROGRAM RELEASED FOR URBANITY-25 WHERE THE PROPERTY INDUSTRY CONNECTS
VIEW FULL AGENDADETAILS
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
print
Print
Urban DesignClare Burnett AND Leon Della BoscaThu 12 Dec 24

Darwin Goes Green to Cool City as Tower Scheme Filed

Darwin heat mitigation strategy HERO

An ambitious plan to cool one of the main streets of Australia’s most northern capital city is getting under way.

The transformation of Darwin’s Smith Street is part of the city’s ambitious plan to reduce urban temperatures and create a more liveable tropical city.

The project, focusing on the stretch between Knuckey and Whitfield streets, forms part of the Darwin City Deal, which is a collaboration between the city, territory, and Commonwealth.

Central to it is the CSIRO-led Darwin Living Lab, which evaluates heat mitigation measures through the Darwin Heat Mitigation and Adaptation Strategy.

Research has shown these measures can decrease outdoor temperatures by up to 6.5C, with surface temperatures of roofs, car parks, and streets potentially reduced by up to 25C in the city.

The strategy responds to a 2017 University of New South Wales study that revealed surface temperatures in some city locations exceeded 60C.

Darwin Lord Mayor Kon Vatskalis said the Smith Street revamp involved significant community engagement and, “taking feedback into consideration, the council has endorsed proceeding to the construction phase”.

The development, to begin in March and complete by June, will include additional tree planting, micro-mobility lanes, new pedestrian crossings, and street furniture. The project tender is expected to be awarded early next year.

According to strategy documents, these initiatives could reduce peak electricity demand by 2 per cent and total cooling load by 7 per cent, offering significant operational cost benefits for property owners.

Cavenagh Street shade canopy
▲ Cavenagh Street, in the centre of Darwin, is an experimental street-cooling project in Darwin.

The success of trials in Cavenagh Street has provided data for the Smith Street project, which aligns with broader NT government plans to require light-coloured roofs on new government buildings and implement energy-efficient building designs.

The NT Government-funded project, delivered by City of Darwin, could also serve as a model for other tropical cities.

The Darwin Living Lab will continue to monitor and evaluate these cooling initiatives, with strategy reviews scheduled every three years, ensuring the city maintains its position as a leader in heat mitigation within wet-dry tropical environments.

Highrise office tower plans filed


Meanwhile, Darwin property developer DCOH has lodged its proposal for a 21-storey city centre office tower.

Revealed earlier this year, the plans are now on exhibition after DCOH partnered with the City of Darwin on the project.

null
▲ The City of Darwin has committed $30 million to redevelop the town’s existing civic centre.

The Civic Tower redevelopment will be occupied at its middle levels by the City of Darwin, with offices from level 10 upwards comprising private office tenancies.

The $150-million integrated development at 17 Harry Chan Avenue in the CBD includes a community centre, place of assembly, and food and drink premises. 

The CA Architects project would also house the council chambers, and four levels of above-ground parking for 460 vehicles. 

Levels seven to nine of the tower would be allocated as City of Darwin administration offices. Each level will offer 1190sq m of gross floor area. 

Private office floors after level 10 will each have a gross area of 1242sq m per level, and there will be a rooftop restaurant.

In total, it will provide 14,713sq m of office, function and retail space.

null
▲ The existing Darwin Civic Centre and subject site from Harry Chan Avenue.

Built form design for the DCOH project aims to reflect the surrounding escarpment and waterfront themes, according to the planning report by Cunnington Rose. 

It provides a juxtaposition to the heritage items within and surrounding the subject land, including Galamarrma, also known as the Tree of Knowledge, a culturally significant heritage-listed Ficus Virens estimated between 200 and 300 years old. 

The site is also partially on top of a World War II era oil storage tunnel, and is across from the Christ Church Cathedral heritage precinct.

DCOH secured the project after the City of Darwin sought expressions of interest for prospective partners later in 2023 for the redevelopment of the civic centre. It also included opportunities for private development and further investment in the Darwin Central Business District.

While Darwin has experienced slower conditions due to high lending rates, according to Colliers, in the quarter to September, there is extremely low to nil vacancy for premium and A-grade office stock in the CBD.

IndustrialRetailOfficeInfrastructureDarwinDevelopmentPlanningUrban DesignArchitectureGovernmentLandscapeConstructionEngineeringPrecinct
AUTHOR
Clare Burnett
More articles by this author
AUTHOR
Leon Della Bosca
More articles by this author
linkedin icon
ADVERTISEMENT
TOP STORIES
Exclusive

Billbergia’s John Kinsella: Whiskey, Fun and a Fear of Heights

Vanessa Croll
8 Min
Exclusive

Paperwork to Plate: The Rise of Brisbane’s Midtown

Taryn Paris
6 Min
Wel Co's Thornhill Park, 40km west of the Melbourne CBD.
Exclusive

Waiting for Victoria: Why Wel.Co says State Planning isn’t Working

Marisa Wikramanayake
6 Min
Woods Bagot Principal Alex Hall and Penny Place Adelaide
Exclusive

Amplified Affordability: Woods Bagot Cracks Housing Cost Code

Leon Della Bosca
8 Min
Goodman Brisbane Industrial EDM
Exclusive

Olympics a ‘Springboard’ for Brisbane’s Industrial Age

Clare Burnett
6 Min
View All >
Mt Coot-tha EDM
Infrastructure

Vision Unveiled for Brisbane’s Mount Coot-tha Precinct

Clare Burnett
High-density residential construction in Melbourne
Finance

‘More Private Credit than Cranes’ But That’s About to Change for Melbourne

Taryn Paris
Ocean reef marina in perths northern beaches will include a new marina, business area, dining and homes
Development

Perth’s Ocean Reef Marina Development Site Sale Looms

Renee McKeown
The 1000-home precinct north of the WA capital will include the city’s first coastal pool and protected man-made beach…
LATEST
Mt Coot-tha EDM
Infrastructure

Vision Unveiled for Brisbane’s Mount Coot-tha Precinct

Clare Burnett
3 Min
High-density residential construction in Melbourne
Finance

‘More Private Credit than Cranes’ But That’s About to Change for Melbourne

Taryn Paris
7 Min
Ocean reef marina in perths northern beaches will include a new marina, business area, dining and homes
Development

Perth’s Ocean Reef Marina Development Site Sale Looms

Renee McKeown
2 Min
Nettleton Tribe Architects' rendering of the new Melbourne Pathology hub on the Costco Docklands site at 331-381 Footscray Road, Docklands.
Healthcare

City Considers Sonic’s Plans for Docklands Costco Site

Marisa Wikramanayake
2 Min
View All >
ADVERTISEMENT
Article originally posted at: https://theurbandeveloper.com/articles/dcoh-darwin-civic-centre-offices-green-urban-design-nt