The Urban Developer
AdvertiseEventsWebinars
Urbanity
Awards
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
Interested in a Corporate TUD+ Membership? Access premium content, site tours, event discounts and networking opportunities
Interested in a Corporate Membership? Access exclusive member benefits today
Enquire NowEnquire
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Partner Lab
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
19
print
Print
OtherTed TabetWed 06 Oct 21

Google Unveils Heritage Redevelopment at Pyrmont Campus

425e0345-0145-45a2-b757-f0800c851ca2

Google is looking to expand its technology precinct in the mixed-use Sydney suburb Pyrmont, lodging plans to redevelop the existing Royal Edward Victualling Yard.

The tech giant has put forward plans for the adaptive re-use of two heritage buildings at 38 and 42 Pirrama Road alongside a new contemporary three-level extension to create a “long-term home” for the technology provider.

The project will expand Google’s growing technology campus, which is currently spread across three other sites.

The yard sits alongside Google Workplace 6—a six-level commercial building offering the tech giant 3600sq m floorplates.

Google picked up the yard’s buildings from developer Aqualand in 2018 for $150 million.

Before it was in private hand, the site was owned and occupied by various government entities between 1905 and 2003 and has historically been used for commercial and industrial purposes.

▲ A pair of former navy warehouses in Sydney’s Pyrmont will be transformed into a new workplace for multi-national tech giant Google. Image: Warren and Mahoney


In mid 2020, Google secured approval for the subdivision of a neighbouring lot on the site, the majority of which will now be amalgamated as part of the broader redevelopment.

The 7300sq m site, the first royal yard in the Southern Hemisphere, has significant heritage overlays.

It is at the south-east corner of Jones Bay, and is bounded by Pirrama Road, Darling Island Road, and Jones Bay.

The federation buildings were originally constructed to warehouse general goods for the Royal Australian Navy and the Postmaster General’s departments, with No 8 Royal Edward Victualling Yard (REVY) one of the few surviving narrow vertical warehouse designs in Sydney.

Google said it had enlisted and worked closely with heritage consultants GBA since the beginning of the design process in early 2020.

▲ Google is planning to relocate the precinct’s entrance to Darling Island Road through Metcalfe Park. Image: Warren and Mahoney


The partly two and partly three storey Warren and Mahoney-designed extension, dubbed Vessel, will slot in between the “wings” of the existing REVY buildings and will ​​sit over a single basement level.

Google plans to restore the REVY buildings to their original condition, with new interior elements, including loose-fit modular meeting rooms to create a contemporary, adjustable and flexible workplaces that can be “pulled away” easily in the future.

The new curved structure will replace the existing two-storey Gatehouse.

It will afford Google additional office space above a ground floor employee and visitors cafe and will be connected to the existing REVY buildings via bridges on level one. It will be topped with a rooftop terrace.

Along the Darling Road side of REVY, two pavilions; the tech pavilion and plant pavilion, will be created at the north and south to house spaces for external and internal presentations and building services.

As part of the masterplan, Google is also intending to create a 3m- wide public boardwalk to provide public access along the foreshore while also upgrading the wharf, sea wall, yard and industrial archaeology.

OtherOfficeIndustrialdo not useAustraliaPlanningPlanningProject
AUTHOR
Ted Tabet
The Urban Developer - Journalist
More articles by this author
website iconlinkedin icon
ADVERTISEMENT
TOP STORIES
One New Zealand Stadium BESIX Watpac
Exclusive

Rising to a Challenge: How BESIX Watpac Topped Australia’s Builders

Clare Burnett
7 Min
Exclusive

Rewards Outstrip Risk in SE Queensland Off-The-Plan Buys

Taryn Paris
7 Min
MONARK co-founders Michael Kark (CEO) and Adam Slade-Jacobson (CIO)
Exclusive

Finding the Sweet Spot: How Monark Built its $2bn Property Empire

Leon Della Bosca
6 Min
Exclusive

Sydney’s Fear of Heights Holding Back Housing

Vanessa Croll
6 Min
North Melbourne Craigieburn HB Land EDM
Exclusive

Tribunal Finding Cruels 1000-Home Melbourne Plan

Clare Burnett
5 Min
View All >
Aeon Residence Chatswood EDM
Residential

Shadows Lift as ‘Nightmare’ Chatswood Site Recast

Vanessa Croll
Build-to-Rent

BtR Platforms, Lease-Ups, Capital Go Under Microscope

David Di Marco
Blackburne Plans $70m Swan River Tower in south perth
Residential

Blackburne Reveals $70m Plan for Blue-Ribbon South Perth

Renee McKeown
One of Perth’s biggest developers has filed plans for a 17-storey tower near the Swan River aimed squarely at the well-h…
LATEST
Aeon Residence Chatswood EDM
Residential

Shadows Lift as ‘Nightmare’ Chatswood Site Recast

Vanessa Croll
4 Min
Build-to-Rent

BtR Platforms, Lease-Ups, Capital Go Under Microscope

David Di Marco
3 Min
Blackburne Plans $70m Swan River Tower in south perth
Residential

Blackburne Reveals $70m Plan for Blue-Ribbon South Perth

Renee McKeown
2 Min
Aliria Cotswold Rise site HERO
Retirement & Aged Care

Aliria Greenlit for Toowoomba Over-50s Townhouses

Leon Della Bosca
3 Min
View All >
ADVERTISEMENT
Article originally posted at: https://theurbandeveloper.com/articles/google-revy-pyrmont-sydney-development-application