The Urban Developer
AdvertiseEventsWebinarsUrbanity
Industry Excellence
Urban Leader
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
JOIN US FOR A ONE-DAY DEEP DIVE INTO THE FUTURE OF THE INDUSTRIAL SECTOR
FIND OUT HOW THE INDUSTRIAL MARKET IS CHANGING IN 2026
LEARN MOREDETAILS
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
print
Print
Sponsored ContentPartner ContentMon 19 Sep 22

How Rondo Helps Builders Handle the Pressure

To ensure compliance with the National Construction Code, it’s important that the correct internal design pressures have been calculated and used by a qualified engineer in the design of steel-framed walls and ceilings in apartments and commercial buildings.

Using a low internal design pressure such as 0.375kPa may be valid for some wall or ceiling applications but adopting it for every project is incorrect.

There are three primary steps that can be used universally to determine internal design pressures applicable to any wall and ceiling system:

  1. What is the basic external design pressure, for project location and geometry?

  2. How does the basic external design pressure get into the building? What is the facade type?

  3. Once inside the building, how does the “internal pressure” act “across” a framing system such as a wall or ceiling?

Step 1 involves basic project variables such as building location, building importance level, type of terrain surrounding the project, and height of the building. Basic design pressure is also influenced by topography, wind directionality, and shielding.

Steps 2 and 3 involve many variables such as if the facade is a fully sealed curtain-wall-type system or contains large operable openings or somewhere in between. Is the wall or ceiling being considered to provide a pressure seal between two spaces? Is it a single stud or discontinuous construction?

Rondo steel stud and track wall system
▲ Rondo’s engineers ensure the internal design pressures are correct.

Rondo’s qualified engineers ensure the correct internal design pressures have been used by customising their designs to a specific building, every time.

They use them from the beginning concepts through to construction to ensure designs are code compliant from the start.

The correct pressure is either confirmed on the project engineering documents (if provided), or one of our qualified engineers calculates it as part of our complimentary design service.

It may take a few extra days to receive a fully customised and compliant wall or ceiling design using the correct internal pressures, but it can be years of rework costs, liquidation damages and rebuilding of reputations if a failure occurs.

Rondo’s latest R-Series ebook, Helpful Guide on Internal Design Pressures and Why they are Important for Compliance, focuses on Step 1 and the variables that affect the basic external-design pressure and then simplifies and applies Steps 2 and 3 to understand how internal design pressures change when the wall and ceiling designs are customised to a specific building.

The Rondo steel framing system has been used on many substantial project around the world, including Crown Towers Sydney, Sofitel Hotel Adelaide, Queens Wharf Brisbane and the Sydney Coliseum Theatre (pictured top).



The Urban Developer is proud to partner with Rondo to deliver this article to you. In doing so, we can continue to publish our daily news, information, insights and opinion to you, our valued readers.

Hoteldo not useBrisbaneAdelaideProject
AUTHOR
Partner Content
More articles by this author
ADVERTISEMENT
TOP STORIES
Exclusive

Queensland Decade of Gigaprojects a Developer’s Goldmine

Phil Bartsch
5 Min
Multiplex Moderna facility
Exclusive

Industrial Subsectors Win Investor Attention as Demand Blossoms

Clare Burnett
7 Min
Bee Bricks hero
Exclusive

Beyond Green: The Rise of Net-Positive Architecture in Australia

Clare Burnett
7 Min
Exclusive

Central Element Hotel Debut Spearheads Oxford Street Renewal

Taryn Paris
8 Min
London skyline near the walkie talkie tower showing the 85 gracechurch street development.
Exclusive

Basilica to Business: London Office Tower’s Historic Rework

Renee McKeown
6 Min
View All >
Planning

Melbourne Blocks Released Under Small Sites Push

Lindsay Saunders
Affordable Townsville hero
Affordable & Social Housing

Greenfield 258-Unit Affordable Plans Launched for Townsville

Clare Burnett
With new office space becoming unfeasible, Deicorp is pivoting to mixed hotel-residential mid-construction.
Office

Deicorp Plots Offices-to-Hotel Crows Nest Tower Switch

Patrick Lau
The developer’s Falcon and Alexander project is turning blue in the facade, in the worst office market in the country.
LATEST
Planning

Melbourne Blocks Released Under Small Sites Push

Lindsay Saunders
2 Min
Affordable Townsville hero
Affordable & Social Housing

Greenfield 258-Unit Affordable Plans Launched for Townsville

Clare Burnett
2 Min
With new office space becoming unfeasible, Deicorp is pivoting to mixed hotel-residential mid-construction.
Office

Deicorp Plots Offices-to-Hotel Crows Nest Tower Switch

Patrick Lau
5 Min
Fortis tops out 122 Moray Street commercial project HERO
Office

Fortis Tops Out $50m South Melbourne Office Scheme

Leon Della Bosca
2 Min
View All >
ADVERTISEMENT
Article originally posted at: https://www.theurbandeveloper.com/articles/how-rondo-helps-builders-handle-the-pressure