The Urban Developer
AdvertiseEventsWebinars
Urbanity
Awards
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
Untitled design (8)
FIRST RELEASE TICKETS ON SALE FOR URBANITY-25 CONNECTING PROPERTY LEADERS ACROSS THE ASIA PACIFIC
FIRST TICKETS ON SALE FOR URBANITY-25 WHERE THE PROPERTY INDUSTRY CONNECTS
SEE DETAILSDETAILS
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Partner Lab
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
print
Print
Sponsored ContentPartner ContentMon 19 Sep 22

How Rondo Helps Builders Handle the Pressure

To ensure compliance with the National Construction Code, it’s important that the correct internal design pressures have been calculated and used by a qualified engineer in the design of steel-framed walls and ceilings in apartments and commercial buildings.

Using a low internal design pressure such as 0.375kPa may be valid for some wall or ceiling applications but adopting it for every project is incorrect.

There are three primary steps that can be used universally to determine internal design pressures applicable to any wall and ceiling system:

  1. What is the basic external design pressure, for project location and geometry?

  2. How does the basic external design pressure get into the building? What is the facade type?

  3. Once inside the building, how does the “internal pressure” act “across” a framing system such as a wall or ceiling?

Step 1 involves basic project variables such as building location, building importance level, type of terrain surrounding the project, and height of the building. Basic design pressure is also influenced by topography, wind directionality, and shielding.

Steps 2 and 3 involve many variables such as if the facade is a fully sealed curtain-wall-type system or contains large operable openings or somewhere in between. Is the wall or ceiling being considered to provide a pressure seal between two spaces? Is it a single stud or discontinuous construction?

Rondo steel stud and track wall system
▲ Rondo’s engineers ensure the internal design pressures are correct.

Rondo’s qualified engineers ensure the correct internal design pressures have been used by customising their designs to a specific building, every time.

They use them from the beginning concepts through to construction to ensure designs are code compliant from the start.

The correct pressure is either confirmed on the project engineering documents (if provided), or one of our qualified engineers calculates it as part of our complimentary design service.

It may take a few extra days to receive a fully customised and compliant wall or ceiling design using the correct internal pressures, but it can be years of rework costs, liquidation damages and rebuilding of reputations if a failure occurs.

Rondo’s latest R-Series ebook, Helpful Guide on Internal Design Pressures and Why they are Important for Compliance, focuses on Step 1 and the variables that affect the basic external-design pressure and then simplifies and applies Steps 2 and 3 to understand how internal design pressures change when the wall and ceiling designs are customised to a specific building.

The Rondo steel framing system has been used on many substantial project around the world, including Crown Towers Sydney, Sofitel Hotel Adelaide, Queens Wharf Brisbane and the Sydney Coliseum Theatre (pictured top).



The Urban Developer is proud to partner with Rondo to deliver this article to you. In doing so, we can continue to publish our daily news, information, insights and opinion to you, our valued readers.

Hoteldo not useBrisbaneAdelaideProject
AUTHOR
Partner Content
More articles by this author
ADVERTISEMENT
TOP STORIES
Bankstown cbd in Sydney NSW EDM
Exclusive

Breaking Delivery Crisis Chokehold on NSW’s Biggest Housing Market

Vanessa Croll
7 Min
Healthscope Hospital EDM
Exclusive

‘Once-in-a-Decade’ Opportunities Rise in Wake of Healthscope Collapse

Clare Burnett
7 Min
Exclusive

Parking Upsize Threatens Fatal Blow to Project Feasibility

Phil Bartsch
6 Min
One New Zealand Stadium BESIX Watpac
Exclusive

Rising to a Challenge: How BESIX Watpac Topped Australia’s Builders

Clare Burnett
7 Min
Exclusive

Rewards Outstrip Risk in SE Queensland Off-The-Plan Buys

Taryn Paris
7 Min
View All >
Sponsored

Fast Funds, Real Help—Woodbridge Capital Delivers Both

Partner Content
Aerial photo of St Mary's Intermodal Terminal in Western Sydney now sold by Pacific National to PGIM and Cadence.
Industrial

Cadence, PGIM Team Up for $145m Freight Rail Acquisition

Marisa Wikramanayake
Development

Melbourne Luna Park Revival Wins State Backing

Marisa Wikramanayake
The Victorian government has provided funding in the state budget to restore Luna Park’s unsafe, century-old Palace Buil…
LATEST
Finance

Fast Funds, Real Help—Woodbridge Capital Delivers Both

Partner Content
5 Min
Aerial photo of St Mary's Intermodal Terminal in Western Sydney now sold by Pacific National to PGIM and Cadence.
Industrial

Cadence, PGIM Team Up for $145m Freight Rail Acquisition

Marisa Wikramanayake
2 Min
Development

Melbourne Luna Park Revival Wins State Backing

Marisa Wikramanayake
2 Min
Sydney Fish Market Blackwattle EDM
Planning

Sydney Fish Market Rezoning Clears Way for 320 Homes

Clare Burnett
2 Min
View All >
ADVERTISEMENT
Article originally posted at: https://theurbandeveloper.com/articles/how-rondo-helps-builders-handle-the-pressure