The Urban Developer
AdvertiseEventsWebinarsUrbanity
Industry Excellence
Urban Leader
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
UPCOMING EVENT - INDUSTRIAL AND LOGISTICS SUMMIT 16 OCTOBER, SYDNEY
INDUSTRIAL AND LOGISTICS SUMMIT - TICKETS NOW ON SALE
LEARN MOREDETAILS
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
5
print
Print
OtherTed TabetMon 29 Mar 21

University Completes Victoria’s Largest Timber Project

516f5f96-e633-4ebe-be89-21806da9dc16

La Trobe University, in Melbourne’s north-east, has completed Victoria’s largest mass timber project.

The $100-million student accommodation project at its Bundoora campus was built from 4500 cubic metres of eco-friendly cross-laminated timber (CLT) and glue-laminated timber, or glulam.

The project, with 624-beds across two separate six-level buildings, marks the largest single investment in La Trobe University’s 50-year history.

The development was designed by Jackson Clements Burrows Architects.

Multiplex regional managing director Graham Cottam said the use of CLT—a non-toxic, fire-resistant, renewable resource with a long-life cycle—had halved the embodied carbon in the development.

It has also achieved a 5-Star Green Star design rating and is targeting a 5-Star Green Star as-built rating.


Interested in understanding more about timber tower construction? Join us for a webinar 1 April 2021. Click here to purchase your ticket.


Multiplex said during construction, three cranes were used to lift and place more than 2700 individual mass timber elements, including the building’s structure, prefabricated pods and facade.

CLT has become a popular building material in Australia in recent years due to the speed of fabrication and cost effectiveness.

Its viability gained a considerable impetus after the National Construction Code introduced less onerous requirements for timber towers of up to eight storeys.

The innovative material has the structural strength of more traditional methods using concrete and steel.

The combined energy to produce the material in Europe and ship it to Australia remains lower than the energy it takes to locally produce materials such as concrete and steel.

It is also a good insulator as it resists heat, it can be simply disassembled and reused for future projects and, significantly, it produces less greenhouse gas emissions.

▲ According to Multiplex, approximately 1200 people worked on-site during construction. Image: Supplied


The completed project forms part of a broader initiative by the university to provide housing for 12,000 residents, including staff and students, in varying formats and ownership models.

The $5bn masterplan includes the development of a new city centre on the Bundoora campus with a substantial mix of commercial and retail facilities.

The university will piggy-back off that development to create significant cultural facilities within the city centre.

Another major component in the masterplan is a Health and Wellbeing Hub that will include aged care, childcare and super-clinic facilities.

La Trobe, which already holds a 6-Star Green Star Communities rating, is striving to become Victoria’s first net zero carbon emission university by 2029 with its regional campuses on track to be carbon neutral by 2022.

ResidentialAustraliaMelbourneConstructionConstructionSector
AUTHOR
Ted Tabet
The Urban Developer - Journalist
More articles by this author
website iconlinkedin icon
ADVERTISEMENT
TOP STORIES
a land lease community home in white at a gemlife development, a type of home which could be the answer to the housing crisis
Residential

‘We are the Solution’: Land Lease Shake-Up Stirs into Life

Renee McKeown
5 Min
Korean coliving hero
Exclusive

Disconnection by Design: Why ‘Untech’ is the Next Big Amenity

Clare Burnett
5 Min
Global Shifts Redraw the Map for Australia’s Office Market
Exclusive

Office Eyes Slowdown as New Stock Supply Becomes a Trickle

Vanessa Croll
7 Min
Salta MD Sam Tarascio
Exclusive

Why Salta Won’t Break Ground on $400m Pipeline

Leon Della Bosca
7 Min
Exclusive

Precinct Proposals Bloom as Brisbane Middle-Ring Sheds its Past

Phil Bartsch
8 Min
View All >
Policy

Electrification, Efficiency: Property’s Climate Target Challenge

Patrick Lau
Legal

Court Freezes Assets as $160m Property Scheme Unravels

Vanessa Croll
Darwin Sentinel Industrial East Arm Deal hero
Industrial

Sentinel Property Expands NT Portfolio with $57.4m Buy

Phil Bartsch
The latest deal brings the value of the fund manager's investment footprint in the Northern Territory to about $700 mill…
LATEST
Policy

Electrification, Efficiency: Property’s Climate Target Challenge

Patrick Lau
7 Min
Legal

Court Freezes Assets as $160m Property Scheme Unravels

Vanessa Croll
2 Min
Darwin Sentinel Industrial East Arm Deal hero
Industrial

Sentinel Property Expands NT Portfolio with $57.4m Buy

Phil Bartsch
2 Min
Kincrest Hollick Place HERO
Residential

Kincrest Acquires Second Essendon Site After Sellout

Leon Della Bosca
3 Min
View All >
ADVERTISEMENT
Article originally posted at: https://www.theurbandeveloper.com/articles/la-trobe-university-victoria-largest-timber-project