The Urban Developer
AdvertiseEventsWebinars
Urbanity
Awards
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
Untitled design (8)
2 WEEKS UNTIL OUR UNMISSABLE FLAGSHIP CONFERENCE MORE THAN 550 ALREADY ATTENDING
2 WEEKS UNTIL OUR FLAGSHIP CONFERENCE 550+ ALREADY ATTENDING
REGISTER NOWDETAILS
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
print
Print
OtherStaff WriterWed 22 Mar 17

New Zealand Is Missing The Point With Timber: Lend Lease

Screen-Shot-2017-03-23-at-2

New Zealand is missing a prime opportunity to combine its sustainable timber resources with an innovative manufacturing system to build faster and more efficiently.

Lend Lease Australia's Head of Operational Excellence Daryl Patterson says Cross Laminated Timber (CLT) is the missing link.

CLT is an engineered wood system made from several layers of dimensional lumber boards, stacked crossways and bonded together.

Speaking at the Wood Processors & Manufacturers Association of New Zealand (WPMA) and Property Council New Zealand Tall Timber Buildings seminar last week, Mr Patterson questioned why, given New Zealand’s ample timber resources, there is not greater use of CLT in our construction sector.

“New Zealand is fortunate as all manufactured timber is made here. In Australia, we import manufactured timber as we don’t have the large timber resources to supply the raw product.

“You also have the design talent, a market that accepts timber and local manufacturers who have invested heavily in the technology to deliver and supply CLT.”

Mr Patterson says he investigated CLT after seeing how 3D printing and robotic technology could be used to manufacture multi storey buildings.

“We had a design team look at this and the challenge was not the printer but the ink.  We had to ask what will we make these buildings from.  We needed a lightweight, strong, easy to manufacture, raw material.

“We looked at over 100 options and it kept coming back to timber: easy to construct, sustainable, durable and cost efficient.”

Source: WPMACLT provides the dimensional stability, strength and rigidity of alternative products at similar costs and can be digitally fabricated.

“This technology allows for mass customisation as the tools of design talk to the tools of production.

“We can now design and manufacture an entire apartment block in a warehouse, from a computer software program and robotics operated by one guy.”

Mr Patterson cites London’s Graphite Apartments as an example.

“We looked first at the 2008 construction of the Graphite Apartments, in London. This was social and affordable housing where CLT was being used in very economically tight circumstances.  They had to make it work and reducing cost was the rationale for using CLT.  They could build faster, cheaper and break the height record for timber buildings by 50 per cent.”

Mr Patterson believes the cost saving is partly due to the speed of construction and the ability to make the building water tight far earlier in the construction process than can be achieved with traditional materials.

Bringing that knowledge back to Australia, Lend Lease went on to build the Forté, Melbourne’s tallest timber building in 2013.

“What we found using CLT was, not only was it faster to build than a conventional building by 30 per cent, we also reduced truck movements to and from the site by 90 per cent.”

Mr Patterson says other benefits included a quieter construction site, a smaller construction crew and significant thermal properties.  He adds the feedback from buyers was overwhelmingly positive.

“Buyers were not concerned about what the building was built out of.  They just wanted a nice, modern home and we were able to deliver that on time, at a reasonable price using CLT.”

Mr Patterson also made reference to the recent, $150 million 5 King development in Brisbane, which is busting the scale for timber buildings at 52 meters high and features over 25,000 square meters of CLT.

“Brisbane is a tough market to sell commercial buildings in.  We wanted to bring construction costs down to reduce rent and attract tenants.

“There is strong interest by investors in sustainable, well-designed, CLT constructed buildings as they are known to attract and retain tenants.

“These buildings offer a lower carbon footprint than other building materials and they are also great environments to work in.”

The implications for New Zealand, Mr Patterson argues, are huge.

“In Christchurch, you have 1000 new buildings constructed with steel and concrete.  These products are being imported from other countries when New Zealand is growing and manufacturing even better buildings in timber frame.

“CLT has the durability, strength, stability, seismic resilience, thermal performance, fire resistance, moisture management and vapour diffusion, healthy indoor environment, and design flexibility.  New Zealand should champion this system and become the world leader in CLT constructed buildings.”

Header image: WPMA 

IndustrialAustraliaConstructionArchitectureConstructionSector
AUTHOR
Staff Writer
"TheUrbanDeveloper.com is committed to delivering the latest news, reviews, opinions and insights into the best of urban development from Australia and around the world. "
More articles by this author
ADVERTISEMENT
TOP STORIES
The Port of Brisbane has released its Vision 2060 which details the need for inland rail connectivity
Infrastructure

Brisbane Port’s $15bn Future Faces One Big Obstacle

Renee McKeown
5 Min
Freecity Rouse Hill triple towers 2 Tempus Street
Exclusive

Freecity Takes Covers Off $330m Triple Towers in Sydney’s North-West

Leon Della Bosca
5 Min
Parallel Workshops Stockdale Housing PBSA project
Exclusive

Suburban Success Story Turns PBSA Thinking on its Head

Leon Della Bosca
7 Min
Exclusive

Interstate Developers Find Lots to Love in ‘Progressive, Affordable’ SA

Taryn Paris
5 Min
Bates Smart Richmond Sportslink HERO
Exclusive

BtR Focus Drives Bates Smart’s Richmond Sportslink Concept

Leon Della Bosca
6 Min
View All >
The Port of Brisbane has released its Vision 2060 which details the need for inland rail connectivity
Infrastructure

Brisbane Port’s $15bn Future Faces One Big Obstacle

Renee McKeown
Logan Wastewater Funding hero
Infrastructure

Flush of Funding to Deliver 20,000 New SEQ Homes

Phil Bartsch
Stockland's Triniti HERO
Build-to-Rent

Stockland $400m North Ryde BtR Approved on Appeal

Leon Della Bosca
The 510-apartment Triniti Lighthouse development has received conditional planning approval despite community objections…
LATEST
The Port of Brisbane has released its Vision 2060 which details the need for inland rail connectivity
Infrastructure

Brisbane Port’s $15bn Future Faces One Big Obstacle

Renee McKeown
5 Min
Logan Wastewater Funding hero
Infrastructure

Flush of Funding to Deliver 20,000 New SEQ Homes

Phil Bartsch
3 Min
Stockland's Triniti HERO
Build-to-Rent

Stockland $400m North Ryde BtR Approved on Appeal

Leon Della Bosca
3 Min
Residential

Home Affordability Gap Widens Across Asia-Pacific

Lindsay Saunders
3 Min
View All >
ADVERTISEMENT
Article originally posted at: https://theurbandeveloper.com/articles/lend-lease-nz-missing-point-timber