The Urban Developer
AdvertiseEventsWebinars
Urbanity
Awards
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
Untitled design (8)
FIRST RELEASE TICKETS ON SALE FOR URBANITY-25 CONNECTING PROPERTY LEADERS ACROSS THE ASIA PACIFIC
FIRST TICKETS ON SALE FOR URBANITY-25 WHERE THE PROPERTY INDUSTRY CONNECTS
SEE DETAILSDETAILS
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
print
Print
ResidentialPhil BartschMon 06 Nov 23

First Stage of $1.2bn Gold Coast Floodplain Estate Greenlit

Walker Corp Gold Coast Lakesview renders hero

The long-awaited go ahead has been given for the first stage of a $1.2-billion project to transform old farmland on a Gold Coast floodplain into a residential estate with 1500 homes.

Walker Corporation’s 73ha Lakesview development will break ground with an initial enclave of 48 two and three-storey townhouses.

Formerly known as the Breakwater development, the first stage also includes “significant earthworks” to create raised residential platforms and for the formation of a system of lakes and wetland areas.

The council’s nod for the project curtain raiser comes more than two years after preliminary approval was granted for the masterplanned development.

Spanning six lots at Robina and Merrimac, the site is west of the city’s 252ha Greenheart parklands site and northwest of Cbus Super Stadium.

According to the planning documents, the development will deliver “a high quality, attractive and walkable residential neighbourhood that provides a high standard of amenity for residents, with integrated waterways and open space and supported by appropriately scaled commercial activities that cater to local residents”.

Connected with new roads and public transport, the masterplanned community will be linked to 50ha of public open space and the parklands by 6km of path and cycle ways.

Under the plans, Walker Corporation plans to rehabilitate the site’s degraded agricultural land and wetlands to benefit both residents and the native wildlife.

The first stage of Lakesview is earmarked for a vacant 1.37ha parcel that has been used for cattle grazing with the lower areas of the site forming part of a floodplain.

The masterplan for Walker Corporation's 73ha Lakesview estate on the Gold Coast.
▲ The masterplan for Walker Corporation's 73ha Lakesview estate on the Gold Coast.

Its 48 townhouses will be established in 16 blocks within one community title development split by a public road. Each townhouse will comprise three to four bedrooms and a double garage.

Three different design types are planned incorporating a variety of materials and colours “to provide differentiation and variation in the built form”.

The first stage is within Precinct 1 of the development, which will feature a mix of low and medium density residential uses such as single dwellings, dual occupancies and multiple dwellings in the form of townhouses or apartments with high amenity, outlook and connectivity to the surrounding open space and recreational opportunities.

The remaining 71.63ha of the site will be further developed to create residential community title schemes as the development progresses. It has approval for buildings up to eight storeys and each future stage will be created as a separate lot and new road.

A lake system with a total area of 7274sq m is proposed as part of the first stage with water to a depth of 3m across the entire lake bed.

“Significant earthworks are proposed in order to provide raised residential platforms which are above the designated site floor levels,” the documents said. “The formation of a system of lakes and wetland areas will provide an excess of current flood storage requirements for the overall site.”

ResidentialAustraliaGold CoastPlanningPlanningSector
AUTHOR
Phil Bartsch
The Urban Developer - Writer
More articles by this author
ADVERTISEMENT
TOP STORIES
PGIM Real Estate Reimagines 444 queen street to 450 queen street brisbane
Exclusive

Coming, Ready or Not: Relic Stripped to Bone for Green Glow-Up

Renee McKeown
5 Min
Darwin has sat dormant for a decade but the resource rich territory is “on the threshold” of a boom for resources and new cities. Weddel and Palmerston
Exclusive

NT Eyes Looming Boom as Planning Commissioner Bows Out

Renee McKeown
5 Min
Exclusive

Gold Coast’s Greatest Moments Yet to Come: Evan Raptis

Phil Bartsch
7 Min
MODEL founder Rory Hunter HERO
Exclusive

‘It’s Massive’: On Mission to Prove BtR Green Equals Gold

Leon Della Bosca
8 Min
Potts Point Coliving EDM
Exclusive

Co-Living Shrugs Off Stigma as Overseas Money Moves In

Clare Burnett
6 Min
View All >
Main Beach Odus Ari Tower Site Deal hero
Residential

Odus Doubles Down in $55m Main Beach Tower Site Deal

Phil Bartsch
Office

A-Grade Perth Office Tower Comes to Market

Lindsay Saunders
Placemaking

Restaurant Revival Slated for Derelict Wynnum Ice Works

Taryn Paris
Closed since 2012, the former fish market would find new life as an upscale waterfront dining destination under the prop…
LATEST
Main Beach Odus Ari Tower Site Deal hero
Residential

Odus Doubles Down in $55m Main Beach Tower Site Deal

Phil Bartsch
3 Min
Office

A-Grade Perth Office Tower Comes to Market

Lindsay Saunders
2 Min
Placemaking

Restaurant Revival Slated for Derelict Wynnum Ice Works

Taryn Paris
2 Min
Build-to-Rent

Townsville’s First BtR Project Wins Green Light

Taryn Paris
2 Min
View All >
ADVERTISEMENT
Article originally posted at: https://theurbandeveloper.com/articles/robina-gold-coast-masterplan-stage-approved