The Urban Developer
AdvertiseEventsWebinars
Urbanity
Awards
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
Untitled design (8)
FULL PROGRAM RELEASED FOR URBANITY-25 CONNECTING PROPERTY LEADERS ACROSS THE ASIA PACIFIC
FULL PROGRAM RELEASED FOR URBANITY-25 WHERE THE PROPERTY INDUSTRY CONNECTS
VIEW FULL AGENDADETAILS
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
30
print
Print
Sponsored ContentPartner ContentMon 27 Apr 20

World First Permanent Formwork Fast Tracks Project Timelines

5ed36720-f51e-4c9c-84d9-223d5e4df034

In the competitive and often cost-driven world of construction, it is rare that genuine project efficiencies can be created with the specification of just one building material.

Rise Products has recently launch Rise Wall Super Finish, described as a “game changer in permanent formwork”.

The only fibre cement solution available in a standardised format, addressing the cost, time and inflexibility associated with using traditional fibre cement systems.

Rise Products chief executive Tim Pope said the business is taking twentieth century technology into the twenty-first century with the world’s first lay-flat permanent formwork system.

“Permanent formwork is an extremely popular building material today, but we could see there were improvements to be made,” Pope said.

“Of course, our lay-flat design means you can have serious volumes delivered to site without the bulk of similar products.”

The panel is a viable alternative to PVC formwork, creating straighter walls, improving fire compliance and offering a higher-quality solution for applied finishes.

The standardised format is generating interest from builders and developers who are frustrated with the limitations of prefabricated fibre cement formwork that adds weeks to site delivery.

“With Rise Wall Super Finish, you have to look beyond the cost of the material, which is already compelling.

“Super Finish allows builders to adapt to changing requirements to keep projects moving.

“Factoring in transport, waste removal, site handling and installation efficiencies, Rise Wall is delivering up to 30 per cent of savings on the permanent formwork component of projects.”


Rise Wall Super Finish builds 100mm, 150mm and 200mm thick concrete walls with a high-quality finish that can also be painted or rendered as required.

In contrast to PVC formwork, which is more impermeable, fibre cement panels are intended for use in more visible areas where a finish might be applied.

The finish of the fibre cement solution provides users with a better surface for the application of paint, render, membranes and tiling.

The walling system is available in insulated and non-insulated formats, and used hollow as a non-structural wall to allow services to be installed once erected.

Unlike PVC formwork, the product is also certified to AS5113 making it suitable as external walling for certain building classes.

“We are proud to be behind something that not only gives project managers an alternative to traditional permanent formwork, without compromising on quality and compliance,” Pope said.

“It also delivers some hard savings in what we know is a challenging time for the construction industry.

“Our 110 SERIES is sold for as little as $60 per square metre. We’ve seen the level of enquiry growing every week, which is encouraging for the future of our now internationally patented solution.”

Rise Wall was conceived by a builder that required access to premium permanent formwork without the prohibitive costs, limitations and frustrations that traditional PVC and fibre cement solutions presented.

The compact, lay-flat design allows six times more materials to be delivered and stored on site, effectively “flat-packed” and ready to construct.

Ideal for internal and external load-bearing walls, the product has been designed as a faster and more profitable way to build, and a viable alternative to conventional formwork, prefabricated structures, masonry and blockwork.

“While our Rise Wall Water Resistant PVC formwork is creating significant efficiencies on site, requiring no specialty trades to install, it’s our Rise Wall Super Finish fibre cement panels that are speeding up building works,” Pope said.

“In NSW, we are offering a supply and install service, and can also train installers on site who may be new to this type of building. It’s definitely where we see the future of permanent formwork in the industry.”

To find out more about Rise Wall, visit Rise Products.


The Urban Developer is proud to partner with Rise Products to deliver this article to you. In doing so, we can continue to publish our free daily news, information, insights and opinion to you, our valued readers.

OtherInternationalDevelopmentPartner
AUTHOR
Partner Content
More articles by this author
ADVERTISEMENT
TOP STORIES
Exclusive

Azure’s Trent Keirnan on Playing the Long Game

Taryn Paris
5 Min
Exclusive

Private Credit Surge, Skittish Buyers Force Banks to Loosen Presale Rules

Taryn Paris
5 Min
Forme's James Place on James Street, Fortitude Valley Brisbane
Exclusive

Forme Pushes the Boundaries on James Street Precinct

Renee McKeown
4 Min
Exclusive

Invicta House Rebirth Proves Recipe for Heritage Success

Leon Della Bosca
7 Min
Exclusive

Freecity’s $300m PBSA to Prove Worth of Modular at Scale

Leon Della Bosca
7 Min
View All >
Nettleton Tribe Architects' rendering of the new Melbourne Pathology hub on the Costco Docklands site at 331-381 Footscray Road, Docklands.
Planning

Dockside Costco Revamp Plans Win City Endorsement

Marisa Wikramanayake
Ashgrove Cielo Waterworks Rd DA Approval hero
Development

Luxury ‘Urban Village’ Greenlit for Leafy Brisbane Suburb

Phil Bartsch
A rendering of Third.i's masterplanned community Charmhaven on the Central Coast of NSW.
Residential

Thirdi Plans $1.6bn Central Coast Housing Community

Marisa Wikramanayake
The plans for a 2000-home masterplanned community would include a sweetener for the NSW Government…
LATEST
Nettleton Tribe Architects' rendering of the new Melbourne Pathology hub on the Costco Docklands site at 331-381 Footscray Road, Docklands.
Planning

Dockside Costco Revamp Plans Win City Endorsement

Marisa Wikramanayake
2 Min
Ashgrove Cielo Waterworks Rd DA Approval hero
Development

Luxury ‘Urban Village’ Greenlit for Leafy Brisbane Suburb

Phil Bartsch
3 Min
A rendering of Third.i's masterplanned community Charmhaven on the Central Coast of NSW.
Residential

Thirdi Plans $1.6bn Central Coast Housing Community

Marisa Wikramanayake
2 Min
134-136 Botany Road HERO
Office

Six-Storey Scheme Proposed for Booming Botany Road

Leon Della Bosca
3 Min
View All >
ADVERTISEMENT
Article originally posted at: https://theurbandeveloper.com/articles/world-first-in-permanent-formwork-is-fast-tracking-project-timelines