The Urban Developer
AdvertiseEventsWebinars
Urbanity
Awards
Sign In
Membership
Latest
Menu
Location
Sector
Category
Content
Type
Newsletters
Untitled design (8)
FULL PROGRAM RELEASED FOR URBANITY-25 CONNECTING PROPERTY LEADERS ACROSS THE ASIA PACIFIC
FULL PROGRAM RELEASED FOR URBANITY-25 WHERE THE PROPERTY INDUSTRY CONNECTS
VIEW FULL AGENDADETAILS
TheUrbanDeveloper
Follow
About
About Us
Membership
Awards
Events
Webinars
Listings
Resources
Terms & Conditions
Commenting Policy
Privacy Policy
Republishing Guidelines
Editorial Charter
Complaints Handling Policy
Contact
General Enquiries
Advertise
Contribution Enquiry
Project Submission
Membership Enquiry
Newsletter
Stay up to date and with the latest news, projects, deals and features.
Subscribe
ADVERTISEMENT
SHARE
print
Print
IndustrialRalph NicholsonFri 15 Dec 23

Aliro Wheels Out Shed Plans for Old Holden Factory

Dandenong Hero

Aliro Group has lodged plans for six warehouses on the site of the former General Motors Holden factory at Victoria’s Dandenong South.

The property development, investment and funds manager will create more than 80,000sq m of industrial and logistics space with the $50-million development.

Plans before the Greater Dandenong City Council show the six warehouses, plus five offices and parking for at least 538 vehicles, would sit on a 13.56-ha property at 48 Assembly Drive, about 35km south-east of Melbourne’s centre.

That address is part of the 62ha General Motors Holden acquired in 1954 for a new body and vehicle assembly plant. The first stage of the plant produced its first vehicle, an FE Holden, on September 19, 1956.

General Motors closed its Dandenong plant in 1991 and six years later it was sold and repurposed as an industrial estate.

Aliro will repurpose a large-format warehouse on the site to create two, while building four more. Disused administrative buildings will be demolished. Each warehouse will have a main office, dock office, separate loading facilities and carparking.

General Motors Holden's plant in Dandenong, in about 1960. The company had its own railway siding built, which while abandoned, still exists today.
▲ General Motors Holden’s plant in Dandenong around 1960. The company had its own railway siding built, which while abandoned, still exists today.

The former General Motors’ administration and cafeteria building on the north-east corner of the site is heritage-listed.

Greater Dandenong council said the GMH plant was a prime example of “a large post-war Victorian factory complex associated with the industrial and commercial development” of the area.

It was the biggest of three major industrial complexes opened at Doveton during the area’s rapid industrial expansion of the 1950s.

The council added it was an example of the “latest in architectural industrial design” with the use of aluminium curtain walls and spandrel glass, as well as the “provision of extensive staff amenities”.

Spandrel glass is designed to be opaque in order to help hide features between the floors of a building, including vents, wires, slab ends and mechanical equipment.

In documents before the council, town planners ProUrban said the industrial park proposal had been developed with regard to the heritage significance of the site.

The complex will boast more than 80,000sq m of industrial and logistics space.
▲ The complex will boast more than 80,000sq m of industrial and logistics space.

The plans were to integrate the curtain glass wall design from the original administration and cafeteria building into Warehouse Two. Built-form setbacks would be similar and the office designs would mimic the previous administration building’s total height.

The planners said rainwater would be captured from the facility, with a combined minimum storage of 120,000 litres. A 100kW solar power system will be installed and translucent roofing would making better use of daylight.

It’s not the first time Aliro Group, led by Charter Hall co-founder David Southon, has lodged plans for a former car-making site.

Originally Aliro had planned to develop the former Toyota car group site in Sydney’s south into a mixed-use business park development with accommodation and pub venues. 

However, it scrapped the masterplan in June—citing a lack of demand for office and commercial space—and just last month applied to reuse some of the structures while developing a further eight new industrial buildings in a staged development in Carringbah.

The estimated cost of that project is $148 million. 

IndustrialMelbourneAustraliaSector
AUTHOR
Ralph Nicholson
More articles by this author
ADVERTISEMENT
TOP STORIES
Exclusive

Private Credit Surge, Skittish Buyers Force Banks to Loosen Presale Rules

Taryn Paris
5 Min
Forme's James Place on James Street, Fortitude Valley Brisbane
Exclusive

Forme Pushes the Boundaries on James Street Precinct

Renee McKeown
4 Min
Exclusive

Invicta House Rebirth Proves Recipe for Heritage Success

Leon Della Bosca
7 Min
Exclusive

Freecity’s $300m PBSA to Prove Worth of Modular at Scale

Leon Della Bosca
7 Min
Exclusive

Billbergia’s John Kinsella: Whiskey, Fun and a Fear of Heights

Vanessa Croll
8 Min
View All >
Exclusive

Private Credit Surge, Skittish Buyers Force Banks to Loosen Presale Rules

Taryn Paris
South Molle Island before Cyclone Debbie
Hotel

South Molle Island on Block as Chinese Owners Exit

Leon Della Bosca
Hindmarsh Tiers Retreat HERO
Hotel

Eco-Luxury Retreat Revealed for SA’s Fleurieu Peninsula

Leon Della Bosca
The luxury wellness retreat comprising 16 eco-pods has been revealed for South Australia’s growing nature tourism market…
LATEST
Exclusive

Private Credit Surge, Skittish Buyers Force Banks to Loosen Presale Rules

Taryn Paris
5 Min
South Molle Island before Cyclone Debbie
Hotel

South Molle Island on Block as Chinese Owners Exit

Leon Della Bosca
4 Min
Hindmarsh Tiers Retreat HERO
Hotel

Eco-Luxury Retreat Revealed for SA’s Fleurieu Peninsula

Leon Della Bosca
3 Min
HWL Ebsworth's adaptive reuse plan for 5 martin Place Sydney
Office

Martin Place ‘Money Box’ Revamp Plans Filed

Leon Della Bosca
4 Min
View All >
ADVERTISEMENT
Article originally posted at: https://theurbandeveloper.com/articles/aliro-warehouse-holden-car-factory-dandenong-assembly-drive